DİLİMLİ DAM PROJECT
Description : The project is realized for the irrigation of 9 300 ha dry land. The total volume of rockfill dam is 8.000.000 m3, height from foundation is 93m, and crest length is 347.63 m. The spillway takes from side. The length of the derivation tunnel is 505 m and the radius is 3.5 m. Also, Injection Horseshoe Tunnel with length of 181 m and Access Horseshoe Tunnel with length of 195.76 m are involved in the project. Besides, There is a 12 km Yuksekova-Esendere Roadway ( included in this project. The road involves 3.455.176 m3 excavation, 120m Hydraulic Bridge, 450 m tunnel, 30 unit structural works (boxes).
Place
Hakkari/TURKEY
Year
13.12.1994
Customer
The General Directorate of State Hydraulic Works
Price
$54.000.000
Availability
Continues
 